Hardwired Blast Chiller installation

Description
Installation by a qualified service provider for your new Blast Chiller. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services
A single phase industry approved isolator switch, junction box or commando socket(blue/grey) protected by a suitably rated circuit breaker(dictated by kilowatt rating in appliance specifications) will be required within a metre of the proposed appliance siting.
Installation work carries a warranty period of 7 days unless there are exceptional circumstances.
Labour to install, commission and test 2 Hours
Services must be easily accessible. The installation does not include cutting through any work surfaces/walls to run services through
Customers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations